KEM have carried out the full Mechanical and Electrical Design, Supply and Installations to the new 44 bedroom extension to the existing Clayton Hotel, Birmingham.

Mechanical Installations:

  • Boosted Water Services
  • Upgrade of existing plant
  • Sanitaryware Installations
  • Above Ground Drainage
  • New Ventilations Systems - New AHU plant, Smoke Vent, Ductwork, Fire Dampers, etc
  • AC Installations and Refrigerant Pipework
  • Dry Riser Pipework and Valving
  • BMS Modifications
  • Testing and Commissioning
  • Full Water Treatment
  • Full set of Drawings and O&M Manuals

Electrical Installations:

  • New Sub Switchboard
  • New Lighting Installations including Emergency Lighting
  • Small Power
  • Containment Systems
  • New Fire Alarm System
  • T.V Installation
  • Structured Cabling
  • Disabled Refuge 
  • CCTV Installation
  • VDA Door Entry/Access System
  • Lightning Protection
  • Earthing and Bonding
  • Testing and Commissioning
  • Full set of Drawings and O&M Manuals



Client: C Field Construction

Project duration: 7 Months

Project value: £965k