KEM were appointed to carry out the Mechanical and Electrical Supply and Installations at the All Saints Building at Heart of Worcestershire College. The existing building was refurbished to provide a new Electrical Training Facility for the students.

The Mechanical Installations consisted of the following;

  • Domestic Hot and Cold Water Services inc; New Tea Point
  • Gas Installations and Re-routing
  • Ventilation Systems inc;  MVHR units, Grilles, Louvres, Diffusers, Fire Dampers etc
  • LTHW Heating Installations inc; Radiator Heating, Commercial Boiler
  • Controls/Building Management Systems
  • Water Treatment and Sampling
  • Testing, Commissioning and Balancing
  • Production of CAD Drawings
  • Production of O&M Manuals

The Electrical Installations consisted of the following;

  • Distribution Systems
  • Internal and External Lighting
  • Emergency Lighting
  • Small Power Installations
  • Fire Alarm System
  • Data Installations
  • Door Access System
  • Testing and Commissioning
  • Production of CAD Drawings
  • Production of O&M Manuals

                                                  

Client: Arden Construction Ltd

Project duration: 3 Months

Project value: £150k