Grosvenor House, 73 Market Street, Stourbridge, DY8 1AQ

Upperford Lodge

KEM Contracting Ltd were appointed to Design, Supply and Install the Mechanical works at Upperford Lodge, Droitwich.

Upperford Lodge is a new build, two storey care home inside the grounds of an existing care home specifically built for Autism West Midlands. Within the care home there are; 8nr assisted care apartments, a central hub area, staff kitchen, 2 meeting rooms and 3nr toilets.

Our Mechanical package consisted of;

  • Domestic Hot Water Services
  • Cold Water Services
  • Refrigerant and Air Conditioning Systems
  • Air Source Heat Pump Installations
  •  Underfloor Heating
  • Above Ground Drainage
  • Ventilation Systems
  • Controls and Building Management Systems
  • Full Testing and Commissioning (Including Water Treatment & Chlorination)
  • Production of CAD drawings
  • Production of Operating and Maintenance Manuals

  

Client: Logmoor Ltd

Project duration: 29 Weeks

Project value: £136k